At last nature cooperated and cleared the climate.From Dec 1 to Dec 5 ,2010 the long awaited INDUSA solar installation & commissioning was done successfully. Presently following equipements are  installaed  & commissioned. All the equipments are working nicely.This would have been not happened without the mutual co- ordination of the INDUSA initiatives .
Following are the instruments installed & commissioned .
1.Solar scheffler concentrator with 500Ltr water heating jacket
2. Solar batch drier
3.Prince 40( Parabolic cooker)
4. 500Ltr insulated tank for continuous hot water supply.
5 Scheffler cooking cabinet with stove.